As part of Basic Order Agreement (BOA) for sewer design services, the main scope of work for this task included the development of design documents for the repair, replacement, and rehabilitation of sanitary sewer mains and manholes located within the Rock Creek Basin.
BvF was responsible for the development of traffic control plans, acquiring permits, and preparing the project baseline schedule using Primavera P6 software. BvF assisted in the development of specifications and the Engineer’s Estimates. BvF directly coordinated with Prince George’s County’s Department of Permitting, Inspections, and Enforcement (DPIE).
BvF also assisted in developing the 30% design complete submittal package, specifically preparing Rehabilitation Recommendation Spreadsheets / GIS Asset Maps and Traffic Control Plans. BvF reviewed CCTV videos of approximately 5,000 LF of 8” sanitary sewer main, identified conditions and defects, and provided preliminary rehabilitation recommendations.