BvF provided design services for the Reconstruction of the Klingle Valley Trail project. The DDOT proposed to build a multi-use trail within the DDOT right of way, remove existing roadway pavement and debris from failed infrastructure, and install stormwater management infrastructure to reduce the erosive effects of uncontrolled stormwater flows and restore the creek. BvF was directly responsible for developing the pre-bid CPM Construction Schedule using the Primavera Scheduling software program, which was included as part of the Contract Bid Documents. The Construction Schedule was an important tool for the Construction Completion Time Analysis and provided updates during community outreach workshops. BvF also provided constructability review services.
This project was awarded one of the 2017-18 ACEC/MW Honor Awards.