As a DBE/MBE subconsultant, BvF delivered comprehensive design and inspection services for various transportation projects. Our expertise includes structural analysis, bridge design, highway design, traffic engineering, utility design, condition inspection, construction management, and general engineering consultant (GEC) services.
Key Task Orders Completed:
1. Electronic Toll Collection (ETC) Signing Modifications:
- Prepared construction documents for modifying ETC signing at the Thomas J. Hatem Memorial Bridge and the John F. Kennedy Memorial Highway.
- Conducted field inventories and prepared final signing plans and cost estimates.
2. On-Call Traffic Engineering Services:
- Conducted manual Turning Movement Classification Counts (TMCs) and machine counts at various intersections.
- Entered crash data for the entire Maryland Transportation Authority facilities into their Crash Data Inventory GIS website.
3. Curtis Creek Guide Rail Mitigation:
- Developed construction details for relapping existing traffic barriers.
- Prepared Engineer’s Estimates, Specifications, and addressed design review comments from MDTA.
4. Independent Review Services:
- Performed peer reviews of documents for highway, drainage, traffic, and structural disciplines.
- Reviewed projects including I-95 Northern Transition, Bay Bridge AET Conversion, and others.
5. Post Construction Inspections of Riprap Placements:
- Inspected riprap placements on facility-wide culvert and pipe rehabilitation projects.
- Assessed field conditions and prepared recommendations for improving stream flow.
6. Belvidere Road Interchange:
- Provided procurement services for the removal and reconstruction of the Belvidere Road bridge over I-95.
- Reviewed design drawings, RFQ and RFP documents, and Proposers’ Alternative Technical Concepts (ATCs).
7. Bay Bridge Westbound Deck Rehabilitation:
- Provided construction inspection for the rehabilitation of the westbound bridge deck and replacement of overhead signal gantries.
- Managed the installation, maintenance, and removal of all Maintenance of Traffic measures.
8. Automated Lane Closure System (ALCS) on Bay Bridge:
- Delivered construction inspection services for installing an ALCS with integrated ITS devices for lane closures and contra-flow operations.
BvF’s comprehensive approach ensures successful project delivery and client satisfaction.