As part of Basic Order Agreement (BOA) for sewer design services, the main scope of work for this task consisted of providing multi-discipline engineering services to assess an alternative alignment for a new, redundant 84″ water transmission main. The new water transmission main would convey potable water from the Potomac WFP Main Zone Water Pumping Station to the existing 66-in and 96-in water transmission mains located in Tack House Court.
BvF was responsible for the development of traffic control plans, acquiring permits, and preparing the project baseline schedule using Primavera P6 software. BvF assisted in the development of specifications and the Engineer’s Estimates. BvF directly coordinated with Prince George’s County’s Department of Permitting, Inspections, and Enforcement (DPIE).
BvF also assisted in developing the 30% design complete submittal package, specifically preparing Rehabilitation Recommendation Spreadsheets / GIS Asset Maps and Traffic Control Plans. BvF reviewed CCTV videos of approximately 5,000 LF of 8” sanitary sewer main, identified conditions and defects, and provided preliminary rehabilitation recommendations.